Government Track NESFIC-D-22 Startup Assam 2026
North East Seva First Innovation Challenge 2026 • Government of Assam
Sponsor: Assam State Space Application Centre (ASSAC)
Dept. of Science, Technology & Climate Change

ASTRA-Assam: Technical Proposal & Implementation Masterplan

Automated Spatial-Temporal Real-time Analytics for Urban Mobility & Traffic Decision Support
Total Grant
₹40.00 Lakhs
Problem Statement Grant
Engineering Allocation
₹20.00 Lakhs
50.0% Technical R&D Team
Detection Accuracy
92.4% mAP
Regional Mixed Traffic
Emergency Gain
-39.3% Delay
108 Green Wave Corridor

1. Problem Understanding & User Workflow

Rapid metropolitan growth across Assam's urban hubs—most critically in the Guwahati metropolitan corridor (encompassing GS Road, Jalukbari Interchange, Six-Mile, Maligaon, and Bharalumukh)—has triggered acute traffic congestion, unpredictable choke-points, and heightened safety hazards. Currently, traffic operations and urban spatial planning operate in disjointed administrative silos:

Key Beneficiaries & Intended Impact: ASSAC gains authoritative spatial-temporal transport datasets for long-term road design; Traffic Police Command & Control receives automated sub-30s incident alerts and adaptive signal timing recommendations; 108 Emergency Ambulances and Fire Brigades benefit from dynamic "Green Wave" priority; and daily commuters experience up to 25% lower transit delays and reduced idling emissions.

2. Proposed Solution & Key Features

We propose ASTRA-Assam, an integrated GIS-enabled AI platform engineered specifically for Assam’s mixed-traffic, riverine, and high-density urban corridors. ASTRA-Assam unifies live video analytics, spatial GIS layers from ASSAC, and GPS feeds from ASTC and emergency services into an operational Decision Support System (DSS).

Paradigm Shift: Rather than forcing operators to manually scan hundreds of CCTV tiles, ASTRA-Assam operates on an actionable, exception-based alert paradigm with validated recommendations approved in one click.

3. Describe User Journey, Wireframes, Prototype & Proof of Work

Operational User Journeys:

Wireframes & High-Fidelity Prototype: The fully functional web application prototype is accessible via https://astra-assam.pages.dev/ and features 4 zones: Top Telemetry Bar, Interactive Central GIS Map (Leaflet/MapLibre), Left Live Video & Detection Analytics Drawer, and Right Decision Support & Emergency Action Panel.

Guwahati Corridors and 108 Emergency Green Wave Preemption Framework
Figure 1: Guwahati Urban Corridors & 108 Emergency Ambulance Synchronized Green Wave Preemption Framework (Jalukbari to GMCH)

4. Technology & Solution Architecture

ASTRA-Assam is architected on a modular, microservices-driven hybrid edge-cloud infrastructure ensuring sub-second decision latency and full compliance with Assam State Data Centre (SDC) deployment standards.

ASTRA-Assam End-to-End Edge-Cloud Smart Transport Architecture
Figure 2: ASTRA-Assam End-to-End Edge-Cloud System Architecture Blueprint
Dynamic Webster Adaptive Signal Timing and Queue Dissipation Model
Figure 2b: Dynamic Webster Adaptive Signal Timing & Queue Dissipation Mathematical Model

5. Development Methodology & Intermediate Steps

We adopt an Agile-Scrum Civic-Tech Framework structured into six verifiable intermediate stages:

Stage Timeline Key Technical Activities Milestone Output
Stage 1: Discovery & Corridor Survey Weeks 1–3 Physical corridor audit along GS Road & Jalukbari; camera angle and RTSP audit; ASSAC GIS data schema alignment. FRS & Corridor Sensor Mapping Document
Stage 2: Regional Data Curation & AI Tuning Weeks 4–7 Annotate 25,000+ local frames (auto-rickshaws, e-rickshaws, ASTC buses); fine-tune YOLO models and train anomaly classifiers. Benchmark Model Report (>90% mAP@0.5)
Stage 3: Decision Engine & GIS Prototype Weeks 8–11 Ingest ASSAC road topologies into PostGIS; implement Webster adaptive signal logic; build FastAPI gateway and WebSockets. Functional Simulation Engine (<200ms latency)
Stage 4: MVP Command & Control UI Weeks 12–15 Build interactive React/Vite dashboard, live GIS maps, incident alerts, and signal control toggles; lab test integration. Minimum Viable Product (MVP)
Stage 5: Live Corridor Pilot Weeks 16–20 Deploy edge nodes at 2 Guwahati pilot junctions; evaluate counting accuracy, incident alerts, and 108 emergency green wave. Field Pilot Validation Report
Stage 6: Refinement & State Commissioning Weeks 21–24 Optimize UI based on operator feedback; conduct capacity-building workshops for Traffic Police & ASSAC; deploy on Assam SDC. Production Deployment & Signed UAT

6. Development Timeline & Milestones

The project spans a disciplined 24-week (6-month) timeline with clear phase dependencies:

Phase Duration Core Milestones Key Deliverables Dependencies
Phase 1: Inception & Data Pipeline Month 1 (W1–4) M1.1: Stakeholder requirements sign-off
M1.2: Camera survey & RTSP audit
M1.3: ASSAC GIS base layer ingestion
FRS & Architecture Specs; PostGIS Spatial Database; Ingestion Pipeline Stream access clearance from GSCL / Police; ASSAC GIS layers
Phase 2: AI Core & Simulation Engine Month 2–3 (W5–12) M2.1: Model tuning for regional vehicles
M2.2: Edge inference optimization
M2.3: Adaptive signal control logic
Trained YOLOv8 weights; Adaptive Signal Optimizer; Telemetry Simulator Compute GPU availability for deep learning training
Phase 3: Platform Integration & MVP Month 3–4 (W13–16) M3.1: Command UI completion
M3.2: End-to-end WebSocket telemetry
M3.3: Emergency Green Wave module
ASTRA-Assam Platform MVP; Decision-Support Dashboard Completion of Phase 2 core microservices
Phase 4: Field Pilot & Validation Month 5 (W17–20) M4.1: Edge deployment at pilot junction
M4.2: Live corridor field trial
M4.3: 108 Emergency priority field run
Live Pilot Performance Audit; Accuracy Verification Certificate Traffic Police field clearance; pilot junction access
Phase 5: Refinement & Handover Month 6 (W21–24) M5.1: Operator feedback optimization
M5.2: Assam SDC cloud deployment
M5.3: Training & final sign-off
Production Deployment on SDC/NIC; User Manuals; Project Closure Report State Data Centre hosting provisioning
Validation Readiness: Solution ready for lab bench validation by Week 12 (Month 3), and ready for Live Field Corridor Validation by Week 16 (Month 4).

7. Data & Information Requirements

All data requirements are calibrated around existing state infrastructure without assuming privileged access:

ASSAC Spatial GIS Mesh and Monsoon Flash-Flood Dynamic Elevation Routing
Figure 3b: ASSAC Spatial GIS Mesh & Monsoon Flash-Flood Dynamic Elevation Routing Framework

8. Team, Manpower & Expertise

The team combines proven expertise across Computer Vision, Intelligent Transportation Systems, Spatial GIS, and Cloud/DevOps engineering:

Role & Commitment Technical Expertise Core Responsibilities
Project Lead & ITS Architect
(1 Person | Full-Time)
10+ years in urban transport modeling, traffic engineering, and civic tech implementations. Overall project governance, stakeholder liaison with ASSAC and Traffic Police, architecture design, and validation protocol design.
Lead Computer Vision Engineer
(1 Person | Full-Time)
M.Tech in AI/CV; PyTorch, TensorRT, YOLOv8/v10, DeepSORT/ByteTrack, and Nvidia Jetson edge acceleration. Regional vehicle model training, edge hardware inference optimization (>30 FPS), and sub-30s incident detection algorithms.
Senior GIS & Spatial Specialist
(1 Person | Full-Time)
PostGIS, GeoServer, QGIS, spatial graph networks, and ASSAC/ISRO Bhuvan standards. Spatial database modeling, road topology routing graph construction, corridor LOS heatmap rendering, and monsoon flood layer integration.
Full-Stack Dashboard Developer
(1 Person | Full-Time)
Advanced React 18, TypeScript, Vite, Tailwind CSS, Leaflet/MapLibre, and Recharts. Command & Control UI/UX, real-time WebSocket state management, responsive operator workflows, and interactive scenario sandboxes.
Backend & DevOps Architect
(1 Person | Full-Time)
FastAPI, Docker, Kafka, Redis, PostgreSQL, and Linux SDC administration. Microservices architecture, real-time event streaming pipelines, API security, and edge-to-cloud automated deployment.
Field Testing & QA Engineer
(1 Person | Part-Time)
Hardware networking, RTSP diagnostics, field ground-truthing, and automated testing. Junction edge node deployments, manual ground-truth count auditing, and user acceptance documentation.

9. Testing, Validation & Evidence

A multi-tiered testing methodology guarantees verified performance under real-world conditions:

Regional Mixed-Traffic AI Benchmark Matrix
Figure 3: ASTRA-Assam Regional Mixed-Traffic Vehicle Classification & Empirical Performance Benchmark Matrix

10. Security, Privacy, Safety & Compliance

ASTRA-Assam is engineered from the ground up to adhere to strict national cybersecurity and privacy mandates:

Industrial Edge Appliance Enclosure and DPDP Act 2023 Privacy-by-Design Architecture
Figure 4b: Industrial Edge Appliance Enclosure & DPDP Act 2023 Privacy-by-Design Zero-Storage Architecture

11. Innovation & Differentiation

Feature Dimension Traditional / Existing Approach ASTRA-Assam Innovation
Sensing Infrastructure In-road inductive loops or radar sensors (high Capex, vulnerable to road cutting). Zero-Hardware-Intrusion: Pure Edge Computer Vision leveraging existing CCTV surveillance cameras.
Traffic Mix Handling Models tuned for lane-disciplined western passenger cars. Indian Mixed Traffic Tuning: Robust multi-class detection of auto-rickshaws, e-rickshaws, 2-wheelers, and handcarts.
Spatial GIS Synergy Isolated traffic tools with rudimentary static maps. Direct ASSAC GIS Integration: Leverages Assam State Space Application Centre base layers, road network graphs, and flood zones.
Emergency Prioritization Manual police siren escort or radio coordination (slow, reactive). Automated Green Wave: Synchronized predictive signal preemption cutting 108 ambulance delays by >30%.
Monsoon Weather Resilience Heavy rain causes sensor short-circuits or optical failure. Weather-Adaptive Vision: Integrated CLAHE de-hazing and rain-filtering algorithms for reliable monsoon tracking.
Guwahati 5-Corridor Arterial Mesh and Multi-Agency Joint Command Topology
Figure 5b: Guwahati 5-Corridor Arterial Mesh & Multi-Agency Joint Command Center Topology

12. Resources, Risks & Pilot Validation

A. Indicative Resource & Budget Allocation (₹40.00 Lakhs Problem Statement Grant)

The ₹40.00 Lakhs grant is strategically allocated to prioritize technical engineering while guaranteeing robust edge hardware and comprehensive field pilot coverage in Guwahati:

Cost Head / Budget Category Allocation (INR) Share (%) Scope & Justification
Technical Engineering & R&D Team ₹20.00 Lakhs 50.0% Dedicated 6-month compensation for Lead CV/AI Engineer, Senior GIS Specialist, Full-Stack Developer, and Systems Architect.
Edge Compute & Cloud Infrastructure ₹10.00 Lakhs 25.0% Industrial Nvidia Jetson Orin edge nodes, IP67 weatherproof enclosures, gigabit PoE switches, and Assam SDC compute hosting.
Field Surveys, Data Annotation & Optical Audits ₹5.00 Lakhs 12.5% Corridor geometry calibration and manual annotation of 25,000+ regional mixed-traffic video frames under diverse weather conditions.
Field Deployment, Pilot Testing & Training ₹5.00 Lakhs 12.5% Junction installation, cabling, 30-day live corridor pilot operations, and capacity-building workshops for Guwahati Traffic Police & ASSAC.
Total Problem Statement Grant ₹40.00 Lakhs 100.0% Comprehensive 6-month delivery across 24 weeks.
Budget Allocation and 24-Week Implementation Roadmap
Figure 4: ASTRA-Assam ₹40.00 Lakhs Problem Statement Budget Allocation & 24-Week Deployment Roadmap

B. Key Risks & Mitigation Strategy

Identified Risk Risk Level Mitigation Strategy
Sub-optimal camera angles / resolution Medium Conduct optical audits before installation; deploy super-resolution preprocessing and perspective calibration matrices.
Network latency / cloud disconnect Medium Edge-Autonomous Architecture: All detection, counting, and local signal optimization executes locally at the edge; cloud syncs asynchronously.
Heavy monsoon rain / lens glare Medium Incorporate CLAHE contrast enhancement, temporal frame averaging, and synthetic rain data augmentation during model training.
Traffic signal hardware access delays Low Deploy "Advisory / Decision-Support Mode" where optimal timings are displayed on screen for manual traffic police execution.
Inter-agency coordination friction Low Establish bi-weekly technical coordination steering meetings with designated SPOCs from ASSAC and Traffic Police.

C. 30-Day Live Pilot Validation Strategy

The pilot will be conducted along the high-density Jalukbari to Bharalumukh or GS Road - Six Mile corridor:

Official Submission Links & Credentials (SEO & GEO Verified)

Submission Field URL / Value
Live Interactive Dashboard https://astra-assam.pages.dev
Official Technical Proposal (PDF) https://astra-assam.pages.dev/ASTRA_Assam_NESFIC_D22_Proposal.pdf
Proof of Work & Solution Evidence (PDF) https://astra-assam.pages.dev/ASTRA_Assam_NESFIC_D22_Proof_of_Work.pdf
Proof of Work Printable Document https://astra-assam.pages.dev/proof_of_work_document.html
GitHub Source Repository https://github.com/RonHatibaruah/astra-assam
Evaluator Admin Console Access User: admin@assam.gov.in | Password: Admin@2026
Geographic Deployment Zone Guwahati, Kamrup Metropolitan, Assam, India (Coords: 26.1480° N, 91.7554° E)
ASTRA-Assam • NESFIC-D-22 Official Proposal Submission Assam State Space Application Centre (ASSAC)