Rapid metropolitan expansion across Guwahati has led to severe congestion bottlenecks along key arterial corridors (GS Road, Jalukbari Interchange, Six Mile, and Maligaon). Current municipal operations are fragmented between Guwahati Traffic Police, GMC, GSCL, ASTC, and ASSAC.
ASTRA-Assam delivers an integrated edge-to-cloud computer vision and GIS spatial decision-support platform. The solution converts existing CCTV networks into dynamic sensors without invasive roadworks, optimizes signal cycles using Webster's adaptive algorithms, and provides synchronized Green Waves for 108 emergency ambulances.
The functional web application prototype was developed using React 18, Vite, Tailwind CSS, Leaflet GIS, and Recharts. Below are the verified functional layouts:
| Corridor Segment | Length | Baseline Speed | HCM LOS | Adaptive Intervention |
|---|---|---|---|---|
| GS Road Primary Arterial (Paltan Bazar - Khanapara) | 11.4 km | 21 km/h | LOS D | Split-cycle flush at Six-Mile (+18s) |
| North Gateway (Jalukbari - Bharalumukh) | 8.6 km | 28 km/h | LOS C | Maligaon flyover diversion active |
| RG Baruah Road (Zoo Road Tiniali) | 5.2 km | 18 km/h | LOS E | Rain flood advisory diversion triggered |
| NH-27 South Bypass (Gorchuk - Beltola) | 18.2 km | 48 km/h | LOS B | Free-flow heavy vehicle bypass |
| Vehicle Typology | Training Sample Size | Precision | Recall | mAP@0.5 |
|---|---|---|---|---|
| Two-Wheelers (Motorcycles / Scooters) | 8,450 | 93.2% | 91.8% | 92.5% |
| Auto-Rickshaws & E-Rickshaws | 6,200 | 92.8% | 90.4% | 91.6% |
| Passenger Cars / Taxis | 5,800 | 95.1% | 94.2% | 94.6% |
| ASTC Public Transit Buses | 2,600 | 96.4% | 95.0% | 95.7% |
| Commercial Heavy Trucks | 1,950 | 94.0% | 91.2% | 92.6% |
| Overall Regional Average | 25,000+ | 94.3% | 92.5% | 92.4% |
During simulated emergency transits from Jalukbari Interchange to Guwahati Medical College Hospital (GMCH, Bhangagarh), the synchronized preemption controller held downstream green lights 40 seconds prior to ambulance arrival. Results:
The budget is allocated to prioritize engineering capabilities, robust edge hardware, and rigorous field ground-truthing in Guwahati:
| Cost Component | Budget (INR) | Share (%) | Scope of Deliverables |
|---|---|---|---|
| Technical Engineering & R&D Team | ₹20.00 Lakhs | 50.0% | Dedicated 6-month compensation for Lead CV/AI Engineer, Senior GIS Specialist, Full-Stack Developer, and Systems Architect. |
| Edge Compute & Cloud Infrastructure | ₹10.00 Lakhs | 25.0% | Industrial Nvidia Jetson Orin edge nodes, IP67 weatherproof enclosures, gigabit PoE switches, and Assam SDC cloud hosting. |
| Field Surveys, Data Annotation & Optical Audits | ₹5.00 Lakhs | 12.5% | Corridor geometry calibration and manual annotation of 25,000+ regional mixed-traffic video frames under monsoon and low-light conditions. |
| Field Deployment, Pilot Testing & Training | ₹5.00 Lakhs | 12.5% | Junction installation, cabling, 30-day live corridor pilot operations, and capacity-building workshops for Guwahati Traffic Police & ASSAC. |
| Total Problem Statement Grant | ₹40.00 Lakhs | 100.0% | Comprehensive delivery across 24 weeks. |
The platform features a secure, role-based Admin Console with demo access credentials for evaluator verification:
admin@assam.gov.in / Admin@2026| Resource / Portal | URL / Location |
|---|---|
| Live Production Platform | https://astra-assam.pages.dev |
| Proof of Work & Solution Evidence (PDF) | https://astra-assam.pages.dev/ASTRA_Assam_NESFIC_D22_Proof_of_Work.pdf |
| Official Technical Proposal (PDF) | https://astra-assam.pages.dev/ASTRA_Assam_NESFIC_D22_Proposal.pdf |
| Official Technical Proposal (Web View) | https://astra-assam.pages.dev/proposal_document.html |
| GitHub Open Source Repository | https://github.com/RonHatibaruah/astra-assam |
| Geographic Deployment Zone | Guwahati, Kamrup Metropolitan, Assam, India (Coords: 26.1480° N, 91.7554° E) |