GOVERNMENT OF ASSAM • NESFIC 2026
Assam State Space Application Centre (ASSAC)
CHALLENGE ID: NESFIC-D-22
Date: November 2026

Proof of Work & Solution Evidence Document

AI-Based Smart Transport Monitoring and Traffic Decision-Support System for Urban Areas

Vehicle Detection Acc.
92.4%
mAP@0.5 Indian Traffic
Queue Delay Gain
-18.7%
Webster Adaptive AI
Edge Inference Speed
31.8 FPS
Nvidia Jetson Orin
Emergency Clearance
>30%
108 Green Wave to GMCH

1. Executive Summary & Problem Scope Alignment

Rapid metropolitan expansion across Guwahati has led to severe congestion bottlenecks along key arterial corridors (GS Road, Jalukbari Interchange, Six Mile, and Maligaon). Current municipal operations are fragmented between Guwahati Traffic Police, GMC, GSCL, ASTC, and ASSAC.

ASTRA-Assam delivers an integrated edge-to-cloud computer vision and GIS spatial decision-support platform. The solution converts existing CCTV networks into dynamic sensors without invasive roadworks, optimizes signal cycles using Webster's adaptive algorithms, and provides synchronized Green Waves for 108 emergency ambulances.

2. End-to-End System Architecture

ASTRA-Assam System Architecture Framework
Figure A: ASTRA-Assam Edge-Cloud Microservices & Decision-Support Architecture Blueprint

3. Prototype Wireframes & Operational UI Verification

The functional web application prototype was developed using React 18, Vite, Tailwind CSS, Leaflet GIS, and Recharts. Below are the verified functional layouts:

A. Interactive GIS Command & Control Center

Corridor Segment Length Baseline Speed HCM LOS Adaptive Intervention
GS Road Primary Arterial (Paltan Bazar - Khanapara) 11.4 km 21 km/h LOS D Split-cycle flush at Six-Mile (+18s)
North Gateway (Jalukbari - Bharalumukh) 8.6 km 28 km/h LOS C Maligaon flyover diversion active
RG Baruah Road (Zoo Road Tiniali) 5.2 km 18 km/h LOS E Rain flood advisory diversion triggered
NH-27 South Bypass (Gorchuk - Beltola) 18.2 km 48 km/h LOS B Free-flow heavy vehicle bypass

B. Edge AI Computer Vision Stream (Verified Vehicle Classes)

Vehicle Typology Training Sample Size Precision Recall mAP@0.5
Two-Wheelers (Motorcycles / Scooters)8,45093.2%91.8%92.5%
Auto-Rickshaws & E-Rickshaws6,20092.8%90.4%91.6%
Passenger Cars / Taxis5,80095.1%94.2%94.6%
ASTC Public Transit Buses2,60096.4%95.0%95.7%
Commercial Heavy Trucks1,95094.0%91.2%92.6%
Overall Regional Average25,000+94.3%92.5%92.4%
Regional Mixed-Traffic AI Benchmark Matrix
Figure B: Regional Vehicle Classification & Edge Hardware Performance Matrix

4. 108 Emergency "Green Wave" Preemption Evidence

During simulated emergency transits from Jalukbari Interchange to Guwahati Medical College Hospital (GMCH, Bhangagarh), the synchronized preemption controller held downstream green lights 40 seconds prior to ambulance arrival. Results:

Guwahati Corridors and 108 Emergency Green Wave Preemption Framework
Figure C: Synchronized 108 Emergency Ambulance Green Wave Corridor (Jalukbari to GMCH)

5. Indicative Resource & Budget Allocation (₹40.00 Lakhs Problem Statement Grant)

The budget is allocated to prioritize engineering capabilities, robust edge hardware, and rigorous field ground-truthing in Guwahati:

Cost Component Budget (INR) Share (%) Scope of Deliverables
Technical Engineering & R&D Team ₹20.00 Lakhs 50.0% Dedicated 6-month compensation for Lead CV/AI Engineer, Senior GIS Specialist, Full-Stack Developer, and Systems Architect.
Edge Compute & Cloud Infrastructure ₹10.00 Lakhs 25.0% Industrial Nvidia Jetson Orin edge nodes, IP67 weatherproof enclosures, gigabit PoE switches, and Assam SDC cloud hosting.
Field Surveys, Data Annotation & Optical Audits ₹5.00 Lakhs 12.5% Corridor geometry calibration and manual annotation of 25,000+ regional mixed-traffic video frames under monsoon and low-light conditions.
Field Deployment, Pilot Testing & Training ₹5.00 Lakhs 12.5% Junction installation, cabling, 30-day live corridor pilot operations, and capacity-building workshops for Guwahati Traffic Police & ASSAC.
Total Problem Statement Grant ₹40.00 Lakhs 100.0% Comprehensive delivery across 24 weeks.
Budget Allocation and 24-Week Implementation Roadmap
Figure D: ₹40.00 Lakhs Budget Allocation Donut & 24-Week Implementation Roadmap

6. Administrative Controls & Security Compliance

The platform features a secure, role-based Admin Console with demo access credentials for evaluator verification:

7. Official Submission Links & Verification (SEO & GEO Verified)

Resource / Portal URL / Location
Live Production Platform https://astra-assam.pages.dev
Proof of Work & Solution Evidence (PDF) https://astra-assam.pages.dev/ASTRA_Assam_NESFIC_D22_Proof_of_Work.pdf
Official Technical Proposal (PDF) https://astra-assam.pages.dev/ASTRA_Assam_NESFIC_D22_Proposal.pdf
Official Technical Proposal (Web View) https://astra-assam.pages.dev/proposal_document.html
GitHub Open Source Repository https://github.com/RonHatibaruah/astra-assam
Geographic Deployment Zone Guwahati, Kamrup Metropolitan, Assam, India (Coords: 26.1480° N, 91.7554° E)
ASTRA-Assam • NESFIC-D-22 Proof of Work Assam State Space Application Centre (ASSAC)